MIME-Version: 1.0 X-Document-Type: Worksheet Content-Location: file:///C:/5B889A57/oa_June17.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html
Advance and FCFS NON NODAL (Transa= ction In June-2017)
W= RLDC NODAL
Sl No Name of the Trader Application N= umber Appl. Date Acceptance From Date To Date Point of Injection Point of Drawal Transmission= System used Time Period<= /td> Capacity= MWh/day
Number Date State Region From To (MW)
1 TATA POWER TRADING LTD 1000002114 04-03-17 WRLDC/35065/A 05-Apr-17 01-Jun-17 03-Jun-17 JINDAL INDIA THERMAL POWER LTD R-INFRA (MSEB) - - ER W3 - 10:00 24:00 126.88 1776.32
05-Jun-17 10-Jun-17 JINDAL INDIA THERMAL POWER LTD R-INFRA (MSEB) - - ER W3 - 10:00 24:00 126.88 1776.32
                                     
= NRLDC - NODAL
Sl No Name of the Trader Application N= umber Appl. Date Acceptance From Date To Date Point of Injection Point of Drawal Transmission= System used Time Period<= /td> Capacity= MWh/day
Number Date State Region From To (MW)
              NIL                      
SR= LDC - NODAL
Sl No Name of the Trader Application N= umber Appl. Date Acceptance From Date To Date Point of Injection Point of Drawal Transmission= System used Time Period<= /td> Capacity<= /td> MWh/day
Number Date State Region From To (MW)
 
N= ERLDC - NODAL
Sl No Name of the Trader Application N= umber Appl. Date Acceptance From Date To Date Point of Injection Point of Drawal Transmission= System used Time Period<= /td> Capacity= MWh/day
Number Date State Region From To (MW)
                                     
D= ay Ahead _ Contingency NON NODAL (Transaction In Feb-2017)
Sl No Name of the customer Applicat= ion  Applicat= ion  Acceptance for scheduling For the date Point of Injection Point of Drawal Transmission System used Time Period<= /td> Capacity Applied Capacity Approved MWh  Total (MWh/Day) MWh/day
Number Date Number Date State Region From To (MW) (MW)
              NIL